BURK & CO.

Multifaceted Innovative Solutions

29693 East Broadway Street
Walbridge, OH 43465

ph: (419)574-8898

  • home
  • About UsClick to open the About Us menu
    • BURKCO Profile
    • BURKCO Clients
    • Code of Conduct
    • Our Safety Culture
    • International Work
    • Diversity & Inclusion
    • Political Contributions
    • Project Team Ventures
    • Awards & Recognition
  • SoftwareClick to open the Software menu
    • MII Software
    • Deltek Software
    • MS Project Software
    • Primavera Software
    • ProjectWise Software
    • FastTrack Schedule 10
  • EducationClick to open the Education menu
    • P3 Training
    • Deltek Training
    • Suretrak Training
    • MS Project Training
    • Primavera P6 Training
    • Primavera Contractor
  • EPMClick to open the EPM menu
    • EVM
    • BIM-VDC
    • Cost Analytics
    • IT Management
    • P6 Implementation
    • Systems Integration
  • ForensicClick to open the Forensic menu
    • Litigation Support
    • Disruption Analysis
    • Claim Entitlement
    • Claim Presentation
    • Delay Claim Analysis
    • Forensic Visualization
  • CPMClick to open the CPM menu
    • 4d Scheduling
    • Schedule Review
    • Schedule Analysis
    • CPM Specifications
    • Resource/Cost Loaded
    • Schedule Development
  • CareersClick to open the Careers menu
    • Work-Life
    • Building Leaders
    • Welcome Military
    • Mentor & Protege
  • MarketsClick to open the Markets menu
    • Education
    • Residential
    • Transportation
    • Environmental
    • EPC / Oil / Gas
    • IT Management
    • Financial Sector
    • Security / Telecom
    • Agricultural Science
    • Museums, Zoos, Parks
    • Commercial & Retail
    • Water & Wastewater
    • Defense & Aerospace
    • Justice & Courthouses
    • Energy, Nuclear, Power
    • Healthcare, Laboratory

Disruption Analysis

Despite careful planning with detailed schedules and fixed completion dates, the complexity and scope of a project may cause delays and other job disruptions.

Terrain, weather, availability of workers, materials and equipment can all affect the rate of completion. When these variables cause inefficiencies in interrelated portions of work, they cause delays as well as the possibility of additional job costs. The term “impact” refers to the string of inefficiencies that are caused by a variable.

Delays, disruptions, interference and acceleration may all be traced back to an event that affected the scheduled work. An analysis of the occurrence determines whether or not there is entitlement to someone for an extension of time. It also determines what, if any, additional costs are associated with the occurrence.

Contact Us Today!

For additional information on our services, visit our contact page or call BURKCO at (419)574-8898.

Copyright 2011 BURK & CO. All rights reserved.

Privacy Policy 

29693 East Broadway Street
Walbridge, OH 43465

ph: (419)574-8898