BURK & CO.

Multifaceted Innovative Solutions

29693 East Broadway Street
Walbridge, OH 43465

ph: (419)574-8898

  • home
  • About UsClick to open the About Us menu
    • BURKCO Profile
    • BURKCO Clients
    • Code of Conduct
    • Our Safety Culture
    • International Work
    • Diversity & Inclusion
    • Political Contributions
    • Project Team Ventures
    • Awards & Recognition
  • SoftwareClick to open the Software menu
    • MII Software
    • Deltek Software
    • MS Project Software
    • Primavera Software
    • ProjectWise Software
    • FastTrack Schedule 10
  • EducationClick to open the Education menu
    • P3 Training
    • Deltek Training
    • Suretrak Training
    • MS Project Training
    • Primavera P6 Training
    • Primavera Contractor
  • EPMClick to open the EPM menu
    • EVM
    • BIM-VDC
    • Cost Analytics
    • IT Management
    • P6 Implementation
    • Systems Integration
  • ForensicClick to open the Forensic menu
    • Litigation Support
    • Disruption Analysis
    • Claim Entitlement
    • Claim Presentation
    • Delay Claim Analysis
    • Forensic Visualization
  • CPMClick to open the CPM menu
    • 4d Scheduling
    • Schedule Review
    • Schedule Analysis
    • CPM Specifications
    • Resource/Cost Loaded
    • Schedule Development
  • CareersClick to open the Careers menu
    • Work-Life
    • Building Leaders
    • Welcome Military
    • Mentor & Protege
  • MarketsClick to open the Markets menu
    • Education
    • Residential
    • Transportation
    • Environmental
    • EPC / Oil / Gas
    • IT Management
    • Financial Sector
    • Security / Telecom
    • Agricultural Science
    • Museums, Zoos, Parks
    • Commercial & Retail
    • Water & Wastewater
    • Defense & Aerospace
    • Justice & Courthouses
    • Energy, Nuclear, Power
    • Healthcare, Laboratory

4d Scheduling

4D schedules are powerful visual tools for phasing and communicating planned project work to a variety of audiences, including project stakeholders and those responsible for executing the work.

These graphically rich and animated models represent the planned schedule sequence set against time. They are used to analyze schedule accuracy and “what if” scenarios, exposing details like out-of-sequence work or scheduling conflicts between multiple trades.

4D schedules can be generated from 2D or 3D models created in CADD and computer modeling systems. Schedules and activity data can also be imported from and exported to systems like Primavera, SureTrak and Microsoft Project. 

Contact Us Today!

For additional information on our services, visit our contact page or call BURKCO at (419)574-8898.

Copyright 2011 BURK & CO. All rights reserved.

Privacy Policy 

29693 East Broadway Street
Walbridge, OH 43465

ph: (419)574-8898